Kitui South NG-CDF allocations 2017/18

0
119
Kitui South MP, Hon. Rachael Kaki Nyamai

Under the headship of Hon. Rachael Kaki Nyamai, the constituency CDF Fund Board allocated the constituency’s slot to the development project proposals for the financial year 2017- 2018 as follows;

ADMINISTRATION AND RECURRENT EXPENDITURE

The NGCDF Board had set aside 0.7M for the payment of salaries to the employees, staff, PAYE and gratuity. A total of 0.8M was allocated for purchase of goods and services has also been set for fuel purchase, insurance, repairs, maintenance of office equipment including the printers, stationery and telephone. This amount also catered for office tea, travel and subsistence.

NSSF payments and NHIF deductions gulped 100,000 and 0.7M respectively. The board committee sitting allowances, transport and conferences benefited Sh. 2,538,620.69.

MONITORING EVALUATION AND CAPACITY BUILDING

0.5M went to the purchase of board vehicles fuel, camera, printing, stationery, photocopying, airtime, travel and subsistence. Board Committee monitoring facilitations, transport, conferences within the constituency took home Sh. 1,604,310.34 Training of the constituency’s PMCs/NG-CDFCs/staff on NG-CDF related issues spent 0.5M.

BURSARY -SECONDARY AND TERTIARY INSTITUTIONS

The students at various secondary schools from the needy family backgrounds were allocated a total of Sh. 11,202,586.21 whereas those at the higher institutions of learning benefited from Sh. 6M.

CONSTITUENCY EMERGENCY KIT
Sh. 4,568,965.52 was reserved to cater for any unforeseen occurrences such as the natural calamities and other emergency issues like disease and hunger outbreaks in the constituency during the financial year 2017/2018.

EDUCATION PRIMARY SCHOOLS.

Ikanga Primary School 1M This went to the renovations of roof of two classrooms, replacement of the old rusty iron sheets, roofing timber and facial boards.
Syomisyi Primary School 0.5M the funds assisted in completion of one classroom, walling gables, roofing, plastering, flooring, shuttering and Painting the newly constructed classroom.
Ndatani Primary School 0.5M This allocation funded the renovations of roof of two classrooms, replacement of iron sheets and timber and facial boards.

ALSO READ:  EASING NAVIGATION, Traffic Snarl Ups Evading Formula in Nairobi

Kongo Primary School 0.5M the allocation was use to facilitate the completion of classroom, walling gables, roofing, plastering, flooring, shuttering and Painting.
Munathi Primary School 0.5M This went to the completion of one classroom, Walling gables, roofing, plastering, flooring, shuttering and Painting.
Kathithu Primary School 0.3M the allotment was used in shuttering (Doors and Windows) and painting of six classrooms.

Kithae Primary School 0.5M the allocation aided the completion of one classroom, walling gables, roofing, plastering, flooring, shuttering and Painting.
Kilisa Primary School 0.9M completion of one pupil learning classroom to decongest the existing classes.

Kenze Primary School 0.5M Renovations of roof of two classrooms; Timber and iron sheets.
Kanthi Primary School 0.5M Completion of one classroom, Walling gables, roofing, plastering, flooring, shuttering and Painting.
Muvuyuni Primary school0.5M Completion of one classroom, Walling gables, roofing, plastering, flooring, shuttering and Painting.
Ndithini Primary School 0.5M Completion of one classroom, Walling gables, roofing, plastering, flooring, shuttering and Painting.
Mang’etheni Primary School 0.5M the allocation assisted in the renovations of roof of two classrooms, timber and old rusty iron sheets replacement.

Kathiani Primary School 0.5M Completion of one classroom, walling gables, roofing, plastering, flooring, shuttering and Painting.
Simisi Primary School 0.5M Completion of one classroom, walling gables, roofing, plastering, flooring, shuttering and Painting.
Kilongoni Primary School 0.9M Construction to completion of one learning classroom.
Kyamako Primary School 0.5M Completion of one classroom, walling gables, roofing, plastering, flooring, shuttering and the class Painting.

Ilamba Primary school 0.5M the allocation was utilized in the completion of one classroom, Walling gables, roofing, plastering, flooring, shuttering and Painting 500,000.00 New
Kimuu Primary School 1M Construction of a New modern Administration Block.
Kiluya Primary School 0.9M This allocation was spent on the construction to completion of one new classroom.
Kivuti Primary SCHOOL 0.5M Completion of a dormitory, plastering, flooring, shutters and painting.

ALSO READ:  Kitui Animal Parade: Cultural festival, Goat Auction nears

AIC Nguuni Primary School 0.5M Completion of one classroom, Walling gables, roofing, plastering, flooring, shuttering and walls Painting.
Mwambua Primary School 0.5M Completion of one classroom, Walling gables, roofing, plastering, flooring, shuttering and Painting.
Muteetu Primary School 0.5M Completion of one classroom, Walling gables, roofing, plastering, flooring, shuttering and Painting.

Kalivu Primary School 0.5M Completion of one classroom, Walling gables, roofing, plastering, flooring, shuttering and Painting.
Maluma Primary school 0.5M This was spent on the completion of one classroom, Walling gables, roofing, plastering, flooring, shuttering and Painting.

Kaunguni Primary school 0.5M Completion of one classroom, walling gables, roofing, plastering, flooring, shuttering and Painting.
Makongo Primary school 0.5M Completion of one classroom, walling gables, roofing, plastering, flooring, shuttering and Painting.
Katulu Primary School 0.5M Completion of one classroom, Walling gables, roofing, plastering, flooring, shuttering and Painting.
Kakungula Primary School 0.5M Completion of one classroom, Walling gables, roofing, plastering, flooring, shuttering and classrooms painting.
Kyangiu Primary school0.5M Completion of one classroom, Walling gables, roofing, plastering, flooring, shuttering and Painting.

Mwaani Primary school – Athi 0.5M Completion of one classroom, walling gables, roofing, plastering, flooring, shuttering and Painting.
Malatani Primary School 0.5M Completion of one classroom, walling gables, roofing, plastering, flooring, shuttering and Painting.
Kwa Kimweli Primary School 0.5M Completion of laboratory, plastering and fixing of benches ion the facility to enable the students carry out their practicals at ease.

ALSO READ:  Mwingi legislator blows whistle over the flawness in defense recruitment

EDUCATION SECONDARY SCHOOLS
Semea Mixed Day Sec School 1M Construction to completion of one new leaning classroom to decongest the already congested classrooms.
Kisayani Secondary School 1.5M Part of the allocation went to the payment of School Bus Yaathi Mixed Day Secondary School 1M Construction to completion of one new classroom.

Mwangala Secondary School 1M Construction to completion of one classroom.
Mutha Secondary School 0.5M Construction of a new school Kitchen to completion.

EDUCATION – TERTIARY INSTITUTIONS
KMTC – Mutomo Campus Sh. 3048834.84 The allocation eased the completion of the various institution stalled development projects. The construction of a Power House – Ksh500,000.00 – Bush clearing and Landscaping -Ksh1,048,834.84 – Electrical Installations to all the Buildings – Ksh1,500,000.00 3,048,834.86
SEKU – Mutomo Campus 8M Construction to completion of 4 Lecture Halls.
Ikanga Teachers Training College 7M This went to fencing of College Land- 20 Acres Ksh4000,000.00 and the construction of 2 Lecture Halls- 3000,000.00 to completion.

SECURITY PROJECTS
Mutomo Administration Police 1M the sum was used in fencing compound with concrete posts and chain link and erecting a new gate to the police base.
Kiange Asst. Chiefs Office 0.5M Completion of the Assistant Chief Office, roofing, Plastering, flooring, shutters and Painting.
Simisi Asst. Chiefs’ Office 0.5M Construction of a Two Room Office Block to Completion to ease the service rendering to the local community by the government.

ICT HUBS Sh. 4,677,027.20 The Installation of Satellite Antenna, Router, Digital access kit, Digital ruggedized Tablet, WI-FI with outdoor wireless device complete with 12U cabinet with installation accessories.
Constituency Strategic Plan 3M Development of a Five Years (2018-2022) Strategic plan NG-CDF Kitui South Constituency.